Matrix-based Methods for Planning and Scheduling Maintenance Projects

Year: 2011
Editor: Eppinger, S. D., Maurer, M., Eben, K., Lindemann, U.
Author: Kiss, J.; Kosztyán, Z.T.; Németh, A.; Bognár, F.
Section: Applications of DSM Methodology
Page(s): 421-434

Abstract

Handling specialities of maintenance projects is a highly challenging task. On the one hand the operations of the maintenance tasks are fixed, and can be described with network or process planning methods. On the other hand the realization sequence of maintenance tasks depends on the risks and reliabilities. Therefore, traditional project and process planning methods are not well suited to manage the maintenance tasks. In this paper a new multilevel planning method is introduced, where project constraints can be taken into account in determining the optimal maintenance project. Tasks which have to be realized can be ranked with our method based on their reliabilities or risk factors. The introduced procedures show how matrix-based methods can be applied for planning and scheduling the maintenance projects on the level of the whole system, the devices, the maintenance tasks and their operations.

Keywords: Multilevel maintenance project planning and scheduling, reliability and risk oriented PEM

Download

Please sign in to your account

This site uses cookies and other tracking technologies to assist with navigation and your ability to provide feedback, analyse your use of our products and services, assist with our promotional and marketing efforts, and provide content from third parties. Privacy Policy.